{"id":305748,"date":"2019-03-18T09:52:53","date_gmt":"2019-03-18T07:52:53","guid":{"rendered":"https:\/\/businesstech.co.za\/news\/?p=305748"},"modified":"2019-03-18T09:52:53","modified_gmt":"2019-03-18T07:52:53","slug":"this-is-eskoms-biggest-problem-right-now-and-it-wont-be-fixed-any-time-soon","status":"publish","type":"post","link":"https:\/\/businesstech.co.za\/news\/energy\/305748\/this-is-eskoms-biggest-problem-right-now-and-it-wont-be-fixed-any-time-soon\/","title":{"rendered":"This is Eskom&#8217;s biggest problem right now &#8211; and it won&#8217;t be fixed any time soon"},"content":{"rendered":"<p>The biggest problem facing Eskom is its inability to build up an emergency electricity margin &#8211; which could result in the current load shedding crisis becoming a more frequent occurrence.<\/p>\n<p>This is according to Department of Public Enterprises spokesperson, Adrian Lackay, who was speaking to <strong><a href=\"http:\/\/www.capetalk.co.za\/articles\/341538\/diminishing-emergency-energy-reserves-a-major-problem-dept-pub-enterprises\" target=\"_blank\" rel=\"noopener noreferrer\">CapeTalk<\/a> <\/strong>on Monday (18 March).<\/p>\n<p>Lackay said that Eskom often faced unplanned outages but this has been compounded by the fact that the power utility&#8217;s ability to build up an emergency margin has diminished since last year &#8211; resulting in the current crisis.<\/p>\n<p>&#8220;Our bigger problem going forward is how do you restore Eskom&#8217;s capability to generate enough electricity to have a reserve margin so that when a crisis hits we don&#8217;t sit where we are now,&#8221; he said.<\/p>\n<p>&#8220;They have installed capacity of some 45,000MW, the country needs about 29,000 &#8211; 30,000MW per day, but because of the poor state of our plant fleet, we hardly reach 30,000 a day.<\/p>\n<p>&#8220;If we can get to 31,000 or 32,000MW a day then you have 2,000 &#8211; 3,000MW reserve margin which can bail you out of a crisis when one hits, but Eskom has lost this capability.&#8221;<\/p>\n<p>Lackay added that Eskom&#8217;s biggest priority right now was getting its stations online to help alleviate stage 4 load shedding.<\/p>\n<p>South Africa faced its fifth consecutive day of power cuts on Monday, with Eskom warning that it plans to continue with load shedding until Wednesday.<\/p>\n<p>Eskom implemented stage 4 load-shedding\u00a0this weekend, blaming the \u201closs of an additional 900MW from Mozambique imports\u201d for the electricity shortage.<\/p>\n<p>Damage caused by\u00a0tropical cyclone Idai\u00a0means that both high-voltage, direct current (HVDC) lines from the Cahora-Bassa hydroelectric generation station to the Apollo substation in Gauteng are down.<\/p>\n<p>The estimated time to restore these links is not known, as the damaged lines are inaccessible and the extent of the damage is unknown.<\/p>\n<hr \/>\n<p><strong> Read: <a href=\"https:\/\/businesstech.co.za\/news\/energy\/305738\/eskom-implements-fifth-day-of-blackouts-to-prevent-system-collapse\/\">Eskom implements fifth day of blackouts to prevent system collapse<\/a><\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>The biggest problem facing Eskom is its inability to build up an emergency electricity margin &#8211; which could result in the current load shedding crisis becoming a more frequent occurrence.<\/p>\n","protected":false},"author":10,"featured_media":301154,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[9874],"tags":[1164,26],"class_list":["post-305748","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-energy","tag-eskom","tag-headline"],"_links":{"self":[{"href":"https:\/\/businesstech.co.za\/news\/wp-json\/wp\/v2\/posts\/305748","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/businesstech.co.za\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/businesstech.co.za\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/businesstech.co.za\/news\/wp-json\/wp\/v2\/users\/10"}],"replies":[{"embeddable":true,"href":"https:\/\/businesstech.co.za\/news\/wp-json\/wp\/v2\/comments?post=305748"}],"version-history":[{"count":5,"href":"https:\/\/businesstech.co.za\/news\/wp-json\/wp\/v2\/posts\/305748\/revisions"}],"predecessor-version":[{"id":305776,"href":"https:\/\/businesstech.co.za\/news\/wp-json\/wp\/v2\/posts\/305748\/revisions\/305776"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/businesstech.co.za\/news\/wp-json\/wp\/v2\/media\/301154"}],"wp:attachment":[{"href":"https:\/\/businesstech.co.za\/news\/wp-json\/wp\/v2\/media?parent=305748"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/businesstech.co.za\/news\/wp-json\/wp\/v2\/categories?post=305748"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/businesstech.co.za\/news\/wp-json\/wp\/v2\/tags?post=305748"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}