{"id":671789,"date":"2023-03-10T13:47:14","date_gmt":"2023-03-10T11:47:14","guid":{"rendered":"https:\/\/businesstech.co.za\/news\/?p=671789"},"modified":"2023-03-10T13:56:53","modified_gmt":"2023-03-10T11:56:53","slug":"eskom-plans-to-ease-load-shedding-this-weekend-heres-the-schedule","status":"publish","type":"post","link":"https:\/\/businesstech.co.za\/news\/energy\/671789\/eskom-plans-to-ease-load-shedding-this-weekend-heres-the-schedule\/","title":{"rendered":"Eskom plans to ease load shedding this weekend &#8211; here&#8217;s the schedule"},"content":{"rendered":"<p>Power utility Eskom says that load shedding will be eased over the weekend &#8211; with hopes that it will move to stage 1 on Sunday (12 March).<\/p>\n<p>Stage 4 load shedding will continue on Friday, before being downgraded to stage 3 on Saturday. The group is planning stage 1 on Sunday, before escalating back to stage 4 in the new week.<\/p>\n<p>The schedule is as follows:<\/p>\n<p><strong>Friday, 10 March<\/strong><\/p>\n<ul>\n<li>Stage 4: until 00h00<\/li>\n<\/ul>\n<p><strong>Saturday, 11 March<\/strong><\/p>\n<ul>\n<li>Stage 4: 00h00 to 05h00<\/li>\n<li>Stage 3: 05h00 to 00h00<\/li>\n<\/ul>\n<p><strong>Sunday, 12 March<\/strong><\/p>\n<ul>\n<li>Stage 3: 00h00 to 05h00<\/li>\n<li>Stage 1: 05h00 to 16h00<\/li>\n<li>Stage 3: 16h00 to 00h00<\/li>\n<\/ul>\n<p><strong>Monday, 13 March<\/strong><\/p>\n<ul>\n<li>Stage 3: 00h00 to 05h00<\/li>\n<\/ul>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-671793\" src=\"https:\/\/businesstech.co.za\/news\/wp-content\/uploads\/2023\/03\/Eskom-load-shedding-10-March.png\" alt=\"\" width=\"671\" height=\"352\" srcset=\"https:\/\/businesstech.co.za\/news\/wp-content\/uploads\/2023\/03\/Eskom-load-shedding-10-March.png 671w, https:\/\/businesstech.co.za\/news\/wp-content\/uploads\/2023\/03\/Eskom-load-shedding-10-March-300x157.png 300w\" sizes=\"auto, (max-width: 671px) 100vw, 671px\" \/><\/p>\n<p>Over the past 24 hours, a generating unit each at Duvha, Kriel and Matla power stations were successfully returned to service.<\/p>\n<p>During the same period a generating unit each at Camden and Kendal power stations were taken offline for repairs.<\/p>\n<p>The return to service of a generating unit each at Hendrina, Medupi and Tutuka, power stations are delayed.<\/p>\n<p>The repairs to the damaged towers from Cahora Bassa in Mozambique is continuing and is anticipated to be completed by early next week, Eskom said.<\/p>\n<p>Breakdowns are currently reduced to 16,469MW of generating capacity while 4,652MW of generating capacity is out of service for planned maintenance.<\/p>\n<p>South Africa has been in a state of near-permanent load shedding since September 2022, and has experienced 130 consecutive days of blackouts since late October.<\/p>\n<p>Load shedding has hit every single day of 2023 so far, often at high stages.<\/p>\n<p>The rolling blackouts have had a dire impact on the economy, leading to a GDP contraction of 1.3% in the fourth quarter of 2022, with many economists expecting the same or worse for the first quarter of 2023.<\/p>\n<p>This would place South Africa into a technical recession.<\/p>\n<p>Given the South African Reserve Bank&#8217;s growth estimates for 2023 &#8211; a paltry 0.3% &#8211; being contingent on South Africa only experiencing 200 days of load shedding, the current prospects for annual GDP do not look good.<\/p>\n<p>Economists have warned that if load shedding is not resolved, South Africa risks facing recession over a much longer term.<\/p>\n<p>Unfortunately for the country, there are no short-term fixes for the outages, and all data points to the situation getting worse as the country heads into the winter months.<\/p>\n<p><strong>Schedules\u00a0<\/strong><\/p>\n<p>For people living in the major metros, load shedding schedules are available here:<\/p>\n<ul>\n<li><a href=\"https:\/\/www.citypower.co.za\/customers\/Pages\/Load_Shedding_Downloads.aspx\">City of Johannesburg<\/a><\/li>\n<li><a href=\"https:\/\/www.ekurhuleni.gov.za\/residents\/load-shedding-schedules.html\">City of Ekurhuleni\u00a0<\/a><\/li>\n<li><a href=\"https:\/\/www.tshwane.gov.za\/?page_id=1124\">City of Tshwane\u00a0<\/a><\/li>\n<li><a href=\"http:\/\/resource.capetown.gov.za\/documentcentre\/Documents\/Procedures%2C%20guidelines%20and%20regulations\/Load_Shedding_All_Areas_Schedule_and_Map.pdf\" target=\"_blank\" rel=\"noopener noreferrer\">City of Cape Town (PDF)<\/a><\/li>\n<li><a href=\"https:\/\/nelsonmandelabay.gov.za\/page\/loadshedding\" target=\"_blank\" rel=\"noopener noreferrer\">Nelson Mandela Bay<\/a><\/li>\n<li><a href=\"https:\/\/www.durban.gov.za\/pages\/residents\/load-shedding\">eThekwini<\/a><\/li>\n<li><a href=\"https:\/\/centlec.co.za\/LoadShedding\/LoadSheddingDocuments\">Manguang<\/a><\/li>\n<li><a href=\"https:\/\/www.buffalocity.gov.za\/notice.php?id=4JVjjqq9G\">Buffalo City<\/a><\/li>\n<\/ul>\n<p>For access to other load shedding schedules, Eskom has made them available on\u00a0<strong><a href=\"http:\/\/loadshedding.eskom.co.za\/\">loadshedding.eskom.co.za.<\/a><\/strong><\/p>\n<p>Smartphone users can also download the app EskomSePush to receive push notifications when load shedding is implemented, as well as the times the area you are in will be off.<\/p>\n<hr \/>\n<p><strong>Read: <a href=\"https:\/\/businesstech.co.za\/news\/business-opinion\/671697\/things-are-looking-very-very-bad-for-load-shedding-in-south-africa\/\" rel=\"bookmark\">Things are looking very, very bad for load shedding in South Africa<\/a><\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Eskom plans to reduce load shedding this weekend.<\/p>\n","protected":false},"author":10,"featured_media":671797,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[9874],"tags":[26],"class_list":["post-671789","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-energy","tag-headline"],"_links":{"self":[{"href":"https:\/\/businesstech.co.za\/news\/wp-json\/wp\/v2\/posts\/671789","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/businesstech.co.za\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/businesstech.co.za\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/businesstech.co.za\/news\/wp-json\/wp\/v2\/users\/10"}],"replies":[{"embeddable":true,"href":"https:\/\/businesstech.co.za\/news\/wp-json\/wp\/v2\/comments?post=671789"}],"version-history":[{"count":4,"href":"https:\/\/businesstech.co.za\/news\/wp-json\/wp\/v2\/posts\/671789\/revisions"}],"predecessor-version":[{"id":671805,"href":"https:\/\/businesstech.co.za\/news\/wp-json\/wp\/v2\/posts\/671789\/revisions\/671805"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/businesstech.co.za\/news\/wp-json\/wp\/v2\/media\/671797"}],"wp:attachment":[{"href":"https:\/\/businesstech.co.za\/news\/wp-json\/wp\/v2\/media?parent=671789"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/businesstech.co.za\/news\/wp-json\/wp\/v2\/categories?post=671789"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/businesstech.co.za\/news\/wp-json\/wp\/v2\/tags?post=671789"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}