{"id":717476,"date":"2023-09-10T14:05:47","date_gmt":"2023-09-10T12:05:47","guid":{"rendered":"https:\/\/businesstech.co.za\/news\/?p=717476"},"modified":"2023-09-10T14:05:47","modified_gmt":"2023-09-10T12:05:47","slug":"get-ready-for-stage-4-load-shedding-this-week-heres-the-new-schedule","status":"publish","type":"post","link":"https:\/\/businesstech.co.za\/news\/energy\/717476\/get-ready-for-stage-4-load-shedding-this-week-heres-the-new-schedule\/","title":{"rendered":"Get ready for stage 4 load shedding this week &#8211; here&#8217;s the new schedule"},"content":{"rendered":"\n<p>Power utility Eskom has announced that load shedding will be switched between various stages this week, but will be at stage 4 in the evenings.<\/p>\n\n\n\n<p>Stage 1 load shedding will continue on Sunday (10 September) until 16h00, thereafter stage 4 outages will be in effect.<\/p>\n\n\n\n<p>On Monday and Tuesday, load shedding will be downgraded to stage 3 between 05h00 and 16h00, and on Wednesday outages will be at stage 2 during those hours.<\/p>\n\n\n\n<p>All schedules are subject to change at any point.<\/p>\n\n\n\n<p>The current plan is outlined below.<\/p>\n\n\n\n<figure class=\"wp-block-image size-full\"><a  data-lightbox=\"post-image\" href=\"https:\/\/businesstech.co.za\/news\/wp-content\/uploads\/2023\/09\/Load-shedding-10-September.png\"><img loading=\"lazy\" decoding=\"async\" width=\"1019\" height=\"534\" src=\"https:\/\/businesstech.co.za\/news\/wp-content\/uploads\/2023\/09\/Load-shedding-10-September.png\" alt=\"\" class=\"wp-image-717478\" srcset=\"https:\/\/businesstech.co.za\/news\/wp-content\/uploads\/2023\/09\/Load-shedding-10-September.png 1019w, https:\/\/businesstech.co.za\/news\/wp-content\/uploads\/2023\/09\/Load-shedding-10-September-300x157.png 300w, https:\/\/businesstech.co.za\/news\/wp-content\/uploads\/2023\/09\/Load-shedding-10-September-768x402.png 768w\" sizes=\"auto, (max-width: 1019px) 100vw, 1019px\" \/><\/a><\/figure>\n\n\n\n<p>Breakdowns are currently at 16 646MW of generating capacity while the capacity out of service for planned maintenance is 5 107MW.<\/p>\n\n\n\n<p>Over a period of 24 hours, no power is being imported from Cahora Bassa due to planned maintenance. This is expected to return to normal levels tomorrow morning, Eskom said.<\/p>\n\n\n\n<p>In the same period, a generating unit at Tutuka Power Station was taken offline for repairs and a generating unit each at Duvha, Kendal, Kriel and two generating units at Arnot power stations were returned to service.<\/p>\n\n\n\n<p>The delay in returning to service a generating unit each at Hendrina, Kendal, Matimba and Matla power stations is also contributing to the current capacity constraints.<\/p>\n\n\n\n<p>During a press briefing on Sunday, electricity minister Kgosientsho Ramokgopa attributed the recent escalation in load shedding to a trifecta of issues: demand remains high and often unpredictable; Eskom has suffered several outages; and planned maintenance has ramped up following the winter cut.<\/p>\n\n\n\n<p>While the minister expressed confidence that the electricity situation will improve heading into the last quarter of the year &#8211; as the Kusile Power Station will be adding much-needed capacity to the grid, providing a buffer for increased maintenance elsewhere &#8211; he did warn that the situation is likely to remain volatile until then.<\/p>\n\n\n\n<p>&nbsp;Ramokgopa said that the government and Eskom will not compromise on the ramping up planned maintenance, which will keep the grid under pressure with little room for failure.<\/p>\n\n\n\n<p>\u201cIf (planned maintenance) coincides with a number of units failing on their own, then you are exposed. And the only option available to us is intensified load shedding.\u201d<\/p>\n\n\n\n<p>\u201cIt is a calculated risk. We are going to do this the right way; we are going to fix these units. It\u2019s a short-term pain for long-term gain,\u201d he said.<\/p>\n\n\n\n<p><strong>Schedules&nbsp;<\/strong><\/p>\n\n\n\n<p>For people living in the major metros, load shedding schedules are available here:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><a href=\"https:\/\/www.citypower.co.za\/customers\/Pages\/Load_Shedding_Downloads.aspx\">City of Johannesburg<\/a><\/li>\n\n\n\n<li><a href=\"https:\/\/www.ekurhuleni.gov.za\/residents\/load-shedding-schedules.html\">City of Ekurhuleni&nbsp;<\/a><\/li>\n\n\n\n<li><a href=\"https:\/\/www.tshwane.gov.za\/?page_id=1124\">City of Tshwane&nbsp;<\/a><\/li>\n\n\n\n<li><a href=\"http:\/\/resource.capetown.gov.za\/documentcentre\/Documents\/Procedures%2C%20guidelines%20and%20regulations\/Load_Shedding_All_Areas_Schedule_and_Map.pdf\" target=\"_blank\" rel=\"noreferrer noopener\">City of Cape Town (PDF)<\/a><\/li>\n\n\n\n<li><a href=\"https:\/\/nelsonmandelabay.gov.za\/page\/loadshedding\" target=\"_blank\" rel=\"noreferrer noopener\">Nelson Mandela Bay<\/a><\/li>\n\n\n\n<li><a href=\"https:\/\/businesstech.co.za\/news\/energy\/690923\/heres-the-new-load-shedding-schedule-for-ethekwini-taking-effect-tomorrow\/\">eThekwini<\/a><\/li>\n\n\n\n<li><a href=\"https:\/\/centlec.co.za\/LoadShedding\/LoadSheddingDocuments\">Manguang<\/a><\/li>\n\n\n\n<li><a href=\"https:\/\/www.buffalocity.gov.za\/notice.php?id=4JVjjqq9G\">Buffalo City<\/a><\/li>\n<\/ul>\n\n\n\n<p>For access to other load shedding schedules, Eskom has made them available on&nbsp;<strong><a href=\"http:\/\/loadshedding.eskom.co.za\/\">loadshedding.eskom.co.za.<\/a><\/strong><\/p>\n\n\n\n<p>Smartphone users can also download the app EskomSePush to receive push notifications when load shedding is implemented, as well as the times the area you are in will be off.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p><strong>Read:\u00a0<a href=\"https:\/\/businesstech.co.za\/news\/energy\/717470\/electricity-minister-warns-of-more-load-shedding-pain-until-kusile-is-back-up\/\">Electricity minister warns of more load shedding pain \u2013 until Kusile is back up<\/a><\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Eskom says load shedding will hit stage 4 in the evenings this week, with stage 2 and 3 during the day.<\/p>\n","protected":false},"author":10,"featured_media":704925,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[9874],"tags":[26],"class_list":["post-717476","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-energy","tag-headline"],"_links":{"self":[{"href":"https:\/\/businesstech.co.za\/news\/wp-json\/wp\/v2\/posts\/717476","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/businesstech.co.za\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/businesstech.co.za\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/businesstech.co.za\/news\/wp-json\/wp\/v2\/users\/10"}],"replies":[{"embeddable":true,"href":"https:\/\/businesstech.co.za\/news\/wp-json\/wp\/v2\/comments?post=717476"}],"version-history":[{"count":1,"href":"https:\/\/businesstech.co.za\/news\/wp-json\/wp\/v2\/posts\/717476\/revisions"}],"predecessor-version":[{"id":717480,"href":"https:\/\/businesstech.co.za\/news\/wp-json\/wp\/v2\/posts\/717476\/revisions\/717480"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/businesstech.co.za\/news\/wp-json\/wp\/v2\/media\/704925"}],"wp:attachment":[{"href":"https:\/\/businesstech.co.za\/news\/wp-json\/wp\/v2\/media?parent=717476"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/businesstech.co.za\/news\/wp-json\/wp\/v2\/categories?post=717476"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/businesstech.co.za\/news\/wp-json\/wp\/v2\/tags?post=717476"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}