{"id":718278,"date":"2023-09-13T14:34:48","date_gmt":"2023-09-13T12:34:48","guid":{"rendered":"https:\/\/businesstech.co.za\/news\/?p=718278"},"modified":"2023-09-13T14:34:48","modified_gmt":"2023-09-13T12:34:48","slug":"eskom-warns-of-push-beyond-stage-6-load-shedding-as-cold-snap-hits","status":"publish","type":"post","link":"https:\/\/businesstech.co.za\/news\/energy\/718278\/eskom-warns-of-push-beyond-stage-6-load-shedding-as-cold-snap-hits\/","title":{"rendered":"Eskom warns of push beyond stage 6 load shedding as cold snap hits"},"content":{"rendered":"\n<p>Power utility Eskom has issued an alert urging South Africans to reduce electricity demand as it grapples with constrained electricity supply due to colder weather.<\/p>\n\n\n\n<p>The utility is already load shedding at all-day stage 6 until further notice &#8211; any further constraints or a spike in demand threaten to push outages even further.<\/p>\n\n\n\n<p>&#8220;Due to the cold weather, we appeal to all members of the public to reduce the electricity demand between 17h00 and 21h00, by switching off non-essential appliances, mainly geysers, swimming pool pumps and electric heaters,&#8221; Eskom said.<\/p>\n\n\n\n<p>It noted that the evening peak forecast for Wednesday is 29,609MW, and yesterday\u2019s demand at the evening peak was 33,423MW &#8211; far higher than the forecast demand. <\/p>\n\n\n\n<p>&#8220;The reduction will continue to assist in alleviating pressure on the system and <strong>avoid higher stages of load shedding<\/strong>,&#8221; it said.<\/p>\n\n\n\n<p>So far, Eskom has not pushed beyond stage 6 load shedding on a national level &#8211; though it has exceeded the 6,000MW &#8220;boundary&#8221; it broadly attaches to stage 6.<\/p>\n\n\n\n<p>On Tuesday, the group shed over 6,000MW, cutting 6,363MW from the grid.<\/p>\n\n\n\n<p>Technically, this is stage 7 load shedding, according to Eskom&#8217;s own definitions; however, load shedding schedules have not pushed up to this stage.<\/p>\n\n\n\n<p>Eskom has explained this away by pointing out that the country is at stage 6 load shedding, with additional capacity shed through load curtailment, which sees industries (and soon businesses and residential areas) cutting demand on a contract basis.<\/p>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full\"><a  data-lightbox=\"post-image\" href=\"https:\/\/businesstech.co.za\/news\/wp-content\/uploads\/2023\/09\/Eskom-load-shedding.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"540\" height=\"549\" src=\"https:\/\/businesstech.co.za\/news\/wp-content\/uploads\/2023\/09\/Eskom-load-shedding.jpg\" alt=\"\" class=\"wp-image-718280\" srcset=\"https:\/\/businesstech.co.za\/news\/wp-content\/uploads\/2023\/09\/Eskom-load-shedding.jpg 540w, https:\/\/businesstech.co.za\/news\/wp-content\/uploads\/2023\/09\/Eskom-load-shedding-295x300.jpg 295w\" sizes=\"auto, (max-width: 540px) 100vw, 540px\" \/><\/a><\/figure><\/div>\n\n\n<p><strong>Schedules&nbsp;<\/strong><\/p>\n\n\n\n<p>For people living in the major metros, load shedding schedules are available here:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><a href=\"https:\/\/www.citypower.co.za\/customers\/Pages\/Load_Shedding_Downloads.aspx\">City of Johannesburg<\/a><\/li>\n\n\n\n<li><a href=\"https:\/\/www.ekurhuleni.gov.za\/residents\/load-shedding-schedules.html\">City of Ekurhuleni&nbsp;<\/a><\/li>\n\n\n\n<li><a href=\"https:\/\/www.tshwane.gov.za\/?page_id=1124\">City of Tshwane&nbsp;<\/a><\/li>\n\n\n\n<li><a href=\"http:\/\/resource.capetown.gov.za\/documentcentre\/Documents\/Procedures%2C%20guidelines%20and%20regulations\/Load_Shedding_All_Areas_Schedule_and_Map.pdf\" target=\"_blank\" rel=\"noreferrer noopener\">City of Cape Town (PDF)<\/a><\/li>\n\n\n\n<li><a href=\"https:\/\/nelsonmandelabay.gov.za\/page\/loadshedding\" target=\"_blank\" rel=\"noreferrer noopener\">Nelson Mandela Bay<\/a><\/li>\n\n\n\n<li><a href=\"https:\/\/businesstech.co.za\/news\/energy\/690923\/heres-the-new-load-shedding-schedule-for-ethekwini-taking-effect-tomorrow\/\">eThekwini<\/a><\/li>\n\n\n\n<li><a href=\"https:\/\/centlec.co.za\/LoadShedding\/LoadSheddingDocuments\">Manguang<\/a><\/li>\n\n\n\n<li><a href=\"https:\/\/www.buffalocity.gov.za\/notice.php?id=4JVjjqq9G\">Buffalo City<\/a><\/li>\n<\/ul>\n\n\n\n<p>For access to other load shedding schedules, Eskom has made them available on&nbsp;<strong><a href=\"http:\/\/loadshedding.eskom.co.za\/\">loadshedding.eskom.co.za.<\/a><\/strong><\/p>\n\n\n\n<p>Smartphone users can also download the app EskomSePush to receive push notifications when load shedding is implemented, as well as the times the area you are in will be off.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p><strong>Read: <a href=\"https:\/\/businesstech.co.za\/news\/trending\/717984\/stage-6-load-shedding-hitting-all-week-heres-the-new-schedule-2\/\">Eskom announces all-day stage 6 load shedding until further notice<\/a><\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Already at stage 6 load shedding, Eskom has urged South Africans to cut demand to avoid hitting higher stages amid cold weather.<\/p>\n","protected":false},"author":10,"featured_media":647437,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[9874],"tags":[1164,26],"class_list":["post-718278","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-energy","tag-eskom","tag-headline"],"_links":{"self":[{"href":"https:\/\/businesstech.co.za\/news\/wp-json\/wp\/v2\/posts\/718278","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/businesstech.co.za\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/businesstech.co.za\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/businesstech.co.za\/news\/wp-json\/wp\/v2\/users\/10"}],"replies":[{"embeddable":true,"href":"https:\/\/businesstech.co.za\/news\/wp-json\/wp\/v2\/comments?post=718278"}],"version-history":[{"count":1,"href":"https:\/\/businesstech.co.za\/news\/wp-json\/wp\/v2\/posts\/718278\/revisions"}],"predecessor-version":[{"id":718286,"href":"https:\/\/businesstech.co.za\/news\/wp-json\/wp\/v2\/posts\/718278\/revisions\/718286"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/businesstech.co.za\/news\/wp-json\/wp\/v2\/media\/647437"}],"wp:attachment":[{"href":"https:\/\/businesstech.co.za\/news\/wp-json\/wp\/v2\/media?parent=718278"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/businesstech.co.za\/news\/wp-json\/wp\/v2\/categories?post=718278"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/businesstech.co.za\/news\/wp-json\/wp\/v2\/tags?post=718278"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}