{"id":759165,"date":"2024-03-11T15:28:58","date_gmt":"2024-03-11T13:28:58","guid":{"rendered":"https:\/\/businesstech.co.za\/news\/?p=759165"},"modified":"2024-03-11T20:18:35","modified_gmt":"2024-03-11T18:18:35","slug":"these-areas-in-joburg-have-been-hit-by-the-equivalent-of-stage-9-load-shedding","status":"publish","type":"post","link":"https:\/\/businesstech.co.za\/news\/government\/759165\/these-areas-in-joburg-have-been-hit-by-the-equivalent-of-stage-9-load-shedding\/","title":{"rendered":"These areas in Joburg have been hit by the equivalent of stage 9 load shedding"},"content":{"rendered":"\n<p>Load rotation due to deteriorating City Power infrastructure means several areas in Johannesburg are currently experiencing outages equivalent to stage 9 load shedding. <\/p>\n\n\n\n<p>In a statement on Monday (11 March), City Power noted it would continue with its emergency load rotation for the Bellevue Substation, which started in February 2024. <\/p>\n\n\n\n<p>Load shedding happens when Eskom\u2019s power supply cannot meet demand due to a constrained grid, and the company shuts down power in a controlled manner (on a national schedule) to prevent a complete grid blackout.<\/p>\n\n\n\n<p>Load rotation, as announced by City Power, is a similar process but on a more localised level and is typically not on a schedule \u2013 ie residents experience unplanned outages as the utility rotates the load between different areas.<\/p>\n\n\n\n<p>However, during extended bouts of outages, a formal schedule can be established, as is the case in areas of Joburg.<\/p>\n\n\n\n<p>The statement noted that <strong>this load rotation impacts several affected areas, including Bellevue, Bellevue East, Upper Houghton, Observatory, and Yeoville. <\/strong><\/p>\n\n\n\n<p>Notably, City Power said that the rotation schedule means some affected consumers will experience around 12 hours of no power in a day &#8211; up to 13.5 hours if the 30-minute switchover periods are included.<\/p>\n\n\n\n<p>Although not nationwide, according to the NRS048-9 specifications,<strong> this is consistent with <\/strong><a href=\"https:\/\/mybroadband.co.za\/news\/energy\/491747-what-stage-9-load-shedding-will-look-like.html\"><strong>stage 9 load shedding<\/strong><\/a><strong>, which is 12 to 14 hours without power per day or over a 24-hour cycle. <\/strong><\/p>\n\n\n\n<p>The full statement with the areas affected, as well as the load rotation schedule, is available below. <\/p>\n\n\n\n<figure class=\"wp-block-embed is-type-rich is-provider-twitter wp-block-embed-twitter\"><div class=\"wp-block-embed__wrapper\">\n<blockquote class=\"twitter-tweet\" data-width=\"500\" data-dnt=\"true\"><p lang=\"fr\" dir=\"ltr\"><a href=\"https:\/\/twitter.com\/hashtag\/InnerCityOutage?src=hash&amp;ref_src=twsrc%5Etfw\">#InnerCityOutage<\/a> <a href=\"https:\/\/twitter.com\/hashtag\/CityPowerUpdates?src=hash&amp;ref_src=twsrc%5Etfw\">#CityPowerUpdates<\/a> <br><br>\ud83d\udce2Bellevue Load Rotation ^MM <a href=\"https:\/\/t.co\/dvZyO1wyzG\">pic.twitter.com\/dvZyO1wyzG<\/a><\/p>&mdash; @CityPowerJhb (@CityPowerJhb) <a href=\"https:\/\/twitter.com\/CityPowerJhb\/status\/1767049098132070871?ref_src=twsrc%5Etfw\">March 11, 2024<\/a><\/blockquote><script async src=\"https:\/\/platform.twitter.com\/widgets.js\" charset=\"utf-8\"><\/script>\n<\/div><\/figure>\n\n\n\n<p>In a statement on 6 February, the utility said that power outages had increased after a fire gutted the Observatory substation in December, destroying the control room, <a href=\"https:\/\/groundup.org.za\/article\/joburg-communities-battling-electricity-outages-protest-outside-city-power\/\" target=\"_blank\" rel=\"noreferrer noopener\">reported<\/a> GroudUp. <\/p>\n\n\n\n<p>\u201cFor a substation\u2019s control room to be rewired and commissioned, it generally takes about 90 days,\u201d the statement read.<\/p>\n\n\n\n<p>The statement also noted that the Bellevue substation was down as well.<\/p>\n\n\n\n<p>Following these issues, City Power noted that the electricity demand was too high to avoid load rotation, as it was creating further damage to the infrastructure. <\/p>\n\n\n\n<p>\u201cConsumption was too high, which caused further problems. As we switched everybody on, it just spiked, and the cables melted and tripped, so we made a decision to rotate the load,\u201d said City Power general manager Arsenio Cossa.<\/p>\n\n\n\n<p>As a result of the &#8216;stage 9&#8217; load shedding-like hours, residents from Yeoville and Bellevue marched to City Power\u2019s Doornfontein Depot at the end of February, hoping to have their electricity restored.<\/p>\n\n\n\n<p>Community member Dennis Webster said there had not been a day without an unplanned outage in Yeoville since the start of 2024.<\/p>\n\n\n\n<p>However, in response to the outcry, City Power noted close to 50% of its customers owe the utility billions in unpaid bills, and this money is what is needed to fix the ailing and unreliable infrastructure.<\/p>\n\n\n\n<p>&#8220;Over 37,000 accounts are defaulted to City Power. Among them are 480 large power users such as manufacturing and mines; over 10,400 businesses and 104 Government departments, including schools, hospitals, some essential services, and departmental offices; and more than 26,600 outstanding residential accounts.<\/p>\n\n\n\n<p>\u201cRevenue collection impacts heavily on the sustainability of our business and is a key focus area.<\/p>\n\n\n\n<p>&#8220;Without this revenue, we cannot invest in the necessary infrastructure to ensure uninterrupted power supply,&#8221; City Power said.<\/p>\n\n\n\n<p>In the case of the Bellevue substation, one business owner told <a href=\"https:\/\/businesstech.co.za\/news\/business\/755277\/gatvol-businesses-in-joburg-threaten-rates-revolt\/\" target=\"_blank\" rel=\"noreferrer noopener\">eNCA<\/a> that City Power estimated that it would take approximately R20 million to sort out the affected infrastructure.<\/p>\n\n\n\n<p>Despite this, City Power has noted that overdue maintenance in areas affected by unplanned outages caused by faults and theft should begin in the next few days.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p><strong>Read: <a href=\"https:\/\/businesstech.co.za\/news\/energy\/758821\/collapse-of-eskom-power-stations-in-photos\/\">Collapse of Eskom power stations in photos<\/a><\/strong><\/p>\n\n\n\n<p><\/p>\n","protected":false},"excerpt":{"rendered":"<p>The load rotation schedule affecting several areas in Gauteng means households and businesses are experiencing the equivalent of stage 9 load shedding.<\/p>\n","protected":false},"author":92,"featured_media":730355,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[23],"tags":[853],"class_list":["post-759165","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-government","tag-south-africa"],"_links":{"self":[{"href":"https:\/\/businesstech.co.za\/news\/wp-json\/wp\/v2\/posts\/759165","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/businesstech.co.za\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/businesstech.co.za\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/businesstech.co.za\/news\/wp-json\/wp\/v2\/users\/92"}],"replies":[{"embeddable":true,"href":"https:\/\/businesstech.co.za\/news\/wp-json\/wp\/v2\/comments?post=759165"}],"version-history":[{"count":3,"href":"https:\/\/businesstech.co.za\/news\/wp-json\/wp\/v2\/posts\/759165\/revisions"}],"predecessor-version":[{"id":759221,"href":"https:\/\/businesstech.co.za\/news\/wp-json\/wp\/v2\/posts\/759165\/revisions\/759221"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/businesstech.co.za\/news\/wp-json\/wp\/v2\/media\/730355"}],"wp:attachment":[{"href":"https:\/\/businesstech.co.za\/news\/wp-json\/wp\/v2\/media?parent=759165"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/businesstech.co.za\/news\/wp-json\/wp\/v2\/categories?post=759165"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/businesstech.co.za\/news\/wp-json\/wp\/v2\/tags?post=759165"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}